Coming Soon
Fab Agent
Tracks every assembly from model to shipped. Flags when shop output is about to fall behind field install dates.
How it Works
Fabrication status never becomes a document. Spool packages, cut lists, and assembly states live in your BIM and CAD models and in Stratus, updating hour by hour while the PDFs in Procore and SharePoint stay frozen at the day they were published. The Fab Agent reads that live layer directly and surfaces it only when a question depends on it, cross-referencing shop progress against field install dates.
34 spool packages · 21 shipped · 2 behind install date · 1 awaiting release
71%
BEHIND
Level 3 · Chilled water mains, CW-118 to CW-126
Shop tracking six days past the install start
Cut and fit complete, welding in progress. Field install starts Aug 24, shop is tracking to Aug 30. Nine spools feed the same riser, so partial shipment does not unblock the crew.
AT RISK
Roof · Condenser water hangers and supports
Three days of float before the roof crane pick
Released to the shop but not started. Rod stock arrives Aug 21, leaving three days of float before the crane pick on Aug 27.
HELD
Level 2 · Sanitary risers, SAN-041 to SAN-047
Not released to fabrication, unresolved model clash
Model shows a clash with the structural beam at grid F4. Detailing cannot release to fabrication until coordination closes, and install is scheduled Sep 3.